Monday, 30 May 2011

Side Panels

I picked up the final few bits and pieces that matter. I have a new favorite supplier, SAS in Shepshed. Click HERE for website. I had to file out the middle of the copper washer for the sump plug because I could not get the exact one. Given the alternative of waiting until late next week it was worth a bit of Dremell action. With the washer filed out to the exact size and sump plug refitted, I topped up the engine oil and then gave the sump plug an extra tweak. I was pleased to find it was not leaking.

Next up was to fill each suspension leg with the right amount of oil. Many years ago I picked up a 60mm syringe. It is just the job for measuring out the oil and for squirting the oil into the tiny filler hole on the top of the suspension leg. 230mm in each leg later, filler caps replaced and top covers tapped on, that job was done too. I had to cut cable ties that held the wires from each switch cluster in order to get access to the top of the suspension legs. It was a small job to refit the cable ties once the oil top up was completed.

I had bought an auxillary power socket some time ago. I decided today was the day to fit it. It went on well enough but it was a fiddle to route and connect the wires. I had to find a longer bolt for the battery terminal to accept the additional connectors. That job done I replaced the tool tray. The wires made the tray fit a little more snug.

The next job was to fit the clutch side hand grip. I wound a couple of turns of insulating tape round the handle bar and forced the grip on. It went on nice and tight but I can see it being a bugger to get off when I decide to connect the heater elements.

After that it was a nuts and bolts check. I moved the Landy so I could get the bike out of the garage. With the bike on the drive, choke lever engaged, I thumbed the starter button the engine turned over but it would not fire. I bit of coaxing and it did fire but just on the one cylinder. I bit of thought then a removed the float bowl from the none firing cylinder to find it was dry...no petrol. I was quite chuffed as I thought the engine sounded short of gas rather than short of spark. I flipped the floats a couple of time which made the petrol flow. I quickly replaced the float bowl since petrol was p*ssing out all over the drive. I thumbed the starter button again and this time she fired. The BM ran strongly if lumpy. The carbs definitely need balancing.

I pulled the clutch lever in and tried to engage a gear but nothing happened. I engaged a gear and dropped the clutch but the back wheel did not turn. I ran up the gear box and down again without success. I imagine all kinds of issues, incorrect clutch installation, iffy gearbox. I put those thoughts to the back of my mind and got a couple of spanners to adjust the free play on the clutch actuator rod. That did the trick. With the engine now idling off the choke I took a chance, dropped the bike off the stand. hooked first gear, revs and clutch out. As with all BM's off this vintage the torque lifted the bike and we were off. Just to the top of the street and back. A result. A couple of issue became apparent but the key thing is the bike runs, suspension and brakes work, and the bike feels quite balanced i.e. the wheels are in line. As it has been raining today and I spilled some petrol. The drive is covered with rainbow patches of petrol. It is still raining so the patches will wash off.

After my tentative trip to the top of the street I adjusted the back brake then left the bike to idle on the drive. The bike was up to temperature. The bike idled evenly over the twenty minutes it stood there. A checked over the bike afterwards to find, more accurately not to find any leaks. I gave the sump plug an eighth of a turn to stop the last little bit of an oil drip.

Asa final act I got the side panel down and fitted each one. The near side panel required my to remove the hand grip from the frame. . It was th work of a moment. With the tricky panel sorted I fitted the off-side panel too and hooked the rubber band between them. Job done th e bike was put back on the stand and a final job list created.